Two-machine shop scheduling problems with batch processing (Q1802481)

From MaRDI portal
scientific article
Language Label Description Also known as
English
Two-machine shop scheduling problems with batch processing
scientific article

    Statements

    Two-machine shop scheduling problems with batch processing (English)
    0 references
    0 references
    21 July 1993
    0 references
    The considered problem is concerned with two machine shop scheduling problems. Jobs are divided into groups and set up times are to be added whenever two jobs of different groups are processed consecutively on the same machine. The problems of minimizing makespan for the flow and open shop are proved to be NP-hard.
    0 references
    0 references
    flow shop
    0 references
    batch processing complexity
    0 references
    two machine shop scheduling
    0 references
    makespan
    0 references
    NP-hard
    0 references
    0 references