Solving an EPQ model with rework and service level constraint (Q2455815)

From MaRDI portal
scientific article
Language Label Description Also known as
English
Solving an EPQ model with rework and service level constraint
scientific article

    Statements

    Solving an EPQ model with rework and service level constraint (English)
    0 references
    0 references
    0 references
    0 references
    26 October 2007
    0 references
    Summary: This paper examines an economic production quantity (EPQ) model with rework and service level constraint. First, we prove that the expected overall costs for an imperfect EPQ model with backlogging permitted is less than or equal to that of the one without backlogging. Secondly, the relationship between ``imputed backorder cost'' and maximal shortage level is derived for decision-making on whether the required service level is achievable. Then an equation for calculating the intangible backorder cost is proposed for situation when the required service level is not attainable. By including this intangible backorder cost in mathematical analysis, one can derive a new optimal lot-size policy that minimizes expected total costs as well as satisfies the maximal shortage level constraint for the EPQ model with rework. Numerical example is provided to demonstrate its practical usage.
    0 references
    manufacturing
    0 references
    economic production quantity
    0 references

    Identifiers