Pages that link to "Item:Q1010277"
From MaRDI portal
The following pages link to Differential evolution for solving multi-mode resource-constrained project scheduling problems (Q1010277):
Displayed 8 items.
- An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem (Q433107) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (Q2256244) (← links)
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem (Q2270291) (← links)
- Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization (Q2356121) (← links)
- A differential evolution algorithm to solve redundancy allocation problems (Q4929092) (← links)
- A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem (Q5246811) (← links)
- Hybrid particle swarm and differential evolution algorithm for solving multimode resource-constrained project scheduling problem (Q5964346) (← links)