Pages that link to "Item:Q1010277"
From MaRDI portal
The following pages link to Differential evolution for solving multi-mode resource-constrained project scheduling problems (Q1010277):
Displaying 22 items.
- Network and contract optimization for maintenance services with remanufacturing (Q337373) (← links)
- An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem (Q433107) (← links)
- Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies (Q526633) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem (Q1651597) (← links)
- Branch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurement (Q1718808) (← links)
- A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags (Q1736833) (← links)
- A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem (Q1752254) (← links)
- A hybrid differential evolution algorithm with column generation for resource constrained job scheduling (Q2003586) (← links)
- Metaheuristics for the online printing shop scheduling problem (Q2030284) (← links)
- Generating a robust baseline schedule for the robust discrete time/resource trade-off problem under work content uncertainty (Q2147061) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (Q2256244) (← links)
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem (Q2270291) (← links)
- Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization (Q2356121) (← links)
- Integrated multi-project planning and scheduling -- a multiagent approach (Q2672092) (← links)
- Resource-Constrained Scheduling with Non-constant Capacity and Non-regular Activities (Q3133907) (← links)
- A differential evolution algorithm to solve redundancy allocation problems (Q4929092) (← links)
- A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem (Q5246811) (← links)
- Hybrid particle swarm and differential evolution algorithm for solving multimode resource-constrained project scheduling problem (Q5964346) (← links)
- Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic (Q6088236) (← links)
- A data-driven \textit{meta}-learning recommendation model for multi-mode resource constrained project scheduling problem (Q6106590) (← links)