The following pages link to A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times (Q1014947):
Displaying 16 items.
- A flow-based tabu search algorithm for the RCPSP with transfer times (Q280159) (← links)
- Modeling and optimizing the evacuation of hospitals based on the MRCPSP with resource transfers (Q339938) (← links)
- An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case (Q1681264) (← links)
- Resource-constrained project scheduling with activity splitting and setup times (Q2003582) (← links)
- A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing (Q2027048) (← links)
- An efficient genetic algorithm for decentralized multi-project scheduling with resource transfers (Q2076410) (← links)
- A tree search heuristic for the resource constrained project scheduling problem with transfer times (Q2079399) (← links)
- Integration of routing into a resource-constrained project scheduling problem (Q2175371) (← links)
- Workforce routing and scheduling for electricity network maintenance with downtime minimization (Q2356225) (← links)
- Managing and modelling general resource transfers in (multi-)project scheduling (Q2379662) (← links)
- Multi-mode resource constrained multi-project scheduling and resource portfolio problem (Q2629594) (← links)
- Integrated multi-project planning and scheduling -- a multiagent approach (Q2672092) (← links)
- Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times (Q2788529) (← links)
- A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times (Q6109310) (← links)
- Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates (Q6112409) (← links)
- Resource-constrained multi-project scheduling problem: a survey (Q6112820) (← links)