Pages that link to "Item:Q1042030"
From MaRDI portal
The following pages link to Identical parallel-machine scheduling under availability constraints to minimize the sum of completion times (Q1042030):
Displaying 12 items.
- Production-driven opportunistic maintenance for batch production based on MAM-APB scheduling (Q300062) (← links)
- Parallel machines scheduling with machine maintenance for minsum criteria (Q421521) (← links)
- Lagrangian relaxation and column generation-based lower bounds for the \(\text{Pm},h_{j1}\parallel \sum w_iC_i\) scheduling problem (Q470933) (← links)
- Optimal solutions for a dock assignment problem with trailer transportation (Q744629) (← links)
- A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach (Q1730479) (← links)
- Two branch-and-bound algorithms for the robust parallel machine scheduling problem (Q1762154) (← links)
- Developing a flexible manufacturing control system considering mixed uncertain predictive maintenance model: a simulation-based optimization approach (Q2241323) (← links)
- A mixed integer linear programming approach to minimize the number of late jobs with and without machine availability constraints (Q2256319) (← links)
- Scheduling jobs and maintenance activities on parallel machines (Q2359536) (← links)
- A Survey on Approximation Algorithms for Scheduling with Machine Unavailability (Q3637311) (← links)
- An ILS heuristic for the ship scheduling problem: application in the oil industry (Q6088240) (← links)
- The parallel AGV scheduling problem with battery constraints: a new formulation and a matheuristic approach (Q6109805) (← links)