Pages that link to "Item:Q1130073"
From MaRDI portal
The following pages link to A procedure for the one-machine sequencing problem with dependent jobs (Q1130073):
Displayed 4 items.
- Configuration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problem (Q309064) (← links)
- An exact approach for single machine subproblems in shifting bottleneck procedures for job shops with total weighted tardiness objective (Q439458) (← links)
- Deterministic job-shop scheduling: Past, present and future (Q1807948) (← links)
- (Q2861532) (← links)