The following pages link to Willy S. Herroelen (Q1145061):
Displaying 50 items.
- (Q161777) (redirect page) (← links)
- (Q213375) (redirect page) (← links)
- (Q1251980) (redirect page) (← links)
- Time slack-based techniques for robust project scheduling subject to resource uncertainty (Q646671) (← links)
- Reactive scheduling in the multi-mode RCPSP (Q709110) (← links)
- The scheduling of activities to maximize the net present value of projects (Q721678) (← links)
- A classification of predictive-reactive project scheduling procedures (Q835548) (← links)
- Scheduling for stability in single-machine production systems (Q835553) (← links)
- Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities (Q835585) (← links)
- Single-pass and approximate dynamic-programming algorithms for order acceptance and capacity planning (Q964848) (← links)
- On the measurement of complexity in activity networks (Q1145062) (← links)
- An optimal procedure for the single-model deterministic assembly line balancing problem (Q1251981) (← links)
- Computational experience with an optimal procedure for the scheduling of activities to maximize the net present value of projects (Q1261390) (← links)
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations (Q1265850) (← links)
- Project management and scheduling (Q1266532) (← links)
- An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem (Q1266548) (← links)
- DAGEN: A generator of testsets for project activity nets (Q1266552) (← links)
- Optimal procedures for the discrete time/cost trade-off problem in project networks (Q1266562) (← links)
- Modelling setup times, process batches and transfer batches using activity network logic (Q1266699) (← links)
- Project network models with discounted cash flows a guided tour through recent developments (Q1278075) (← links)
- On the use of the complexity index as a measure of complexity in activity networks (Q1278225) (← links)
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations (Q1303751) (← links)
- On a paper by Christofides et al. for solving the multiple-resource constrained, single project scheduling problem (Q1331569) (← links)
- Resource-constrained project scheduling: A survey of recent developments. (Q1406618) (← links)
- Project scheduling. A research handbook. (Q1422056) (← links)
- Project scheduling under uncertainty: survey and research potentials (Q1772834) (← links)
- The multi-mode resource-constrained project scheduling problem with generalized precedence relations (Q1807061) (← links)
- Progress payments in project scheduling problems. (Q1812008) (← links)
- The construction of stable project baseline schedules (Q1877894) (← links)
- Proactive policies for the stochastic resource-constrained project scheduling problem (Q2275822) (← links)
- Rangen: A random network generator for activity-on-the-node networks (Q2464376) (← links)
- Proactive heuristic procedures for robust project scheduling: An experimental analysis (Q2482749) (← links)
- The complexity of machine scheduling for stability with a single disrupted job (Q2488217) (← links)
- On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints (Q3114719) (← links)
- Phase transitions in project scheduling (Q3157306) (← links)
- New computational results on the discrete time/cost trade-off problem in project networks (Q3157790) (← links)
- (Q3426427) (← links)
- Dynamic order acceptance and capacity planning on a single bottleneck resource (Q3499292) (← links)
- (Q3968723) (← links)
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (Q4032492) (← links)
- (Q4233362) (← links)
- Local search methods for the discrete time/resource trade-off problem in project networks (Q4255025) (← links)
- A Random Activity Network Generator (Q4286475) (← links)
- A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem (Q4367245) (← links)
- New Benchmark Results for the Resource-Constrained Project Scheduling Problem (Q4392509) (← links)
- (Q4398247) (← links)
- Discrete time/cost trade-offs in project scheduling with time-switch constraints (Q4656679) (← links)
- Identification and illumination of popular misconceptions about project scheduling and time buffering in a resource-constrained environment (Q4671553) (← links)
- Maximizing the net present value of a project with linear time-dependent cash flows (Q4679968) (← links)
- Resource-constrained Project Scheduling — The State of the Art (Q5650498) (← links)
- A note on the paper ''Resource-constraint project scheduling: Notation, classification, models and methods'' by Bruckner et al (Q5925873) (← links)
- An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem (Q5948200) (← links)