Pages that link to "Item:Q1198326"
From MaRDI portal
The following pages link to Capacitated lot-sizing and scheduling by Lagrangean relaxation (Q1198326):
Displayed 17 items.
- A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem (Q319274) (← links)
- A Lagrangian relaxation-based method and models evaluation for multi-level lot sizing problems with backorders (Q336386) (← links)
- Reformulation and a Lagrangian heuristic for lot sizing problem on parallel machines (Q490153) (← links)
- The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times (Q706984) (← links)
- Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches (Q857326) (← links)
- Lagrangean relaxation based heuristics for lot sizing with setup times (Q953424) (← links)
- Integrated inventory model for similar products under a two-echelon supply chain environment: an empirical study (Q998715) (← links)
- GRASP heuristic with path-relinking for the multi-plant capacitated lot sizing problem (Q1044091) (← links)
- Capacitated lot-sizing and scheduling by Lagrangean relaxation (Q1198326) (← links)
- Efficient post-optimization analysis procedure for the dynamic lot-sizing problem (Q1261343) (← links)
- Lot sizing and scheduling -- survey and extensions (Q1278770) (← links)
- Multi-item capacitated lot-sizing by a cross decomposition based algorithm (Q1339158) (← links)
- Improved lower bounds for the capacitated lot sizing problem with setup times. (Q1417600) (← links)
- A capacitated lot sizing problem with stochastic setup times and overtime (Q1991273) (← links)
- Dynamic capacitated lot-sizing problems: a classification and review of solution approaches (Q2379665) (← links)
- A Lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines (Q2433465) (← links)
- MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs (Q3598683) (← links)