Pages that link to "Item:Q1256391"
From MaRDI portal
The following pages link to Using fuzzy set theory in a scheduling problem: A case study (Q1256391):
Displaying 36 items.
- Maximum and minimum between fuzzy symbols in non-interactive and weakly non-interactive situations (Q585178) (← links)
- A heuristic method for RCPSP with fuzzy activity times (Q621664) (← links)
- Criticality analysis of activity networks under interval uncertainty (Q633555) (← links)
- A path enumeration approach for the analysis of critical activities in fuzzy networks (Q713412) (← links)
- Bi-level multiple mode resource-constrained project scheduling problems under hybrid uncertainty (Q747027) (← links)
- Using fuzzy sets in operational research (Q791444) (← links)
- Developing a heuristic algorithm for order production planning using network models under uncertainty conditions (Q858779) (← links)
- Job sequencing with fuzzy processing times (Q908844) (← links)
- Fuzzy project scheduling problem and its hybrid intelligent algorithm (Q967803) (← links)
- New fuzzy models for time-cost trade-off problem (Q975376) (← links)
- On the latest starting times and criticality of activities in a network with imprecise durations (Q988966) (← links)
- Computing latest starting times of activities in interval-valued networks with minimal time lags (Q1044116) (← links)
- Scheduling arrivals to a production system in a fuzzy environment (Q1268199) (← links)
- A fuzzy-linguistic approach to a multi-criteria sequencing problem (Q1268297) (← links)
- FUN: a dynamic method for scheduling problems (Q1388821) (← links)
- Generalized path-finding algorithms on semirings and the fuzzy shortest path problem. (Q1421231) (← links)
- On computing the latest starting times and floats of activities in a network with imprecise durations (Q1770714) (← links)
- Survey on fuzzy shop scheduling (Q1794871) (← links)
- Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge (Q1869705) (← links)
- Fuzzy temporal characteristics of operations for project management on the network models basis (Q1869708) (← links)
- On latest starting times and floats in activity networks with ill-known durations (Q1869710) (← links)
- Parallel machine scheduling models with fuzzy processing times (Q1886763) (← links)
- Application of fuzzy distributions on project management (Q1920255) (← links)
- Solving project scheduling problem with the philosophy of fuzzy random programming (Q1927267) (← links)
- Evolutionary tabu search for flexible due-date satisfaction in fuzzy job shop scheduling (Q2177824) (← links)
- Project scheduling problem with mixed uncertainty of randomness and fuzziness (Q2370337) (← links)
- Chance-constrained model for uncertain job shop scheduling problem (Q2403327) (← links)
- A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project (Q2434282) (← links)
- Parallel Tabu Search Algorithm with Uncertain Data for the Flexible Job Shop Problem (Q2814143) (← links)
- A New Approach to Find Project Characteristics and Multiple Possible Critical Paths in a Fuzzy Project Network (Q5216837) (← links)
- A cooperative co-evolutionary particle swarm optimiser based on a niche sharing scheme for the flow shop scheduling problem under uncertainty (Q5740381) (← links)
- Critical path analysis in the network with fuzzy activity times (Q5951737) (← links)
- The computational complexity of the criticality problems in a network with interval activity times (Q5953342) (← links)
- Optimization with uncertainties: a scheduling example (Q6090379) (← links)
- Project scheduling problem with fuzzy activity durations: a novel operational law based solution framework (Q6109248) (← links)
- Project management using network analysis in fuzzy environment (Q6608593) (← links)