Pages that link to "Item:Q1278462"
From MaRDI portal
The following pages link to Scheduling projects to maximize net present value -- the case of time-dependent, contingent cash flows (Q1278462):
Displaying 11 items.
- Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective (Q744648) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- A GA optimization model for workgroup-based repetitive scheduling (WoRSM) (Q1005604) (← links)
- Which fuzzy ranking method is best for maximizing fuzzy net present value? (Q1640504) (← links)
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (Q1767683) (← links)
- Progress payments in project scheduling problems. (Q1812008) (← links)
- The project scheduling problem with irregular starting time costs (Q1969764) (← links)
- Metaheuristics for multi-mode capital-constrained project payment scheduling (Q2253378) (← links)
- Client‐contractor bargaining on net present value in project scheduling with limited resources (Q3621917) (← links)
- An integer linear programming model and a modified branch and bound algorithm for the project material requirements planning problem (Q4469137) (← links)
- Optimization of a highway project planning using a modified genetic algorithm (Q4981882) (← links)