Pages that link to "Item:Q1278630"
From MaRDI portal
The following pages link to Scheduling of flexible flow lines in an automobile assembly plant (Q1278630):
Displaying 10 items.
- Control methods for dynamic time-based manufacturing under customized product lead times (Q439459) (← links)
- A taxonomy of flexible flow line scheduling procedures (Q859681) (← links)
- A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria (Q954034) (← links)
- Minimizing makespan in two-stage hybrid cross docking scheduling problem (Q1001000) (← links)
- A bottleneck-based heuristic for minimizing makespan in a flexible flow line with unrelated parallel machines (Q1025264) (← links)
- Scheduling flexible flow lines with sequence-dependent setup times (Q1876159) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- Cyclic scheduling in robotic flowshops with bounded work-in-process levels (Q2994797) (← links)
- Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times (Q3163716) (← links)
- Capacity-constrained production scheduling of multiple vehicle programs in an automotive pilot plant (Q3439877) (← links)