The following pages link to S. T. Enns (Q1296699):
Displaying 7 items.
- Lead time selection and the behaviour of work flow in job shops (Q1296700) (← links)
- Job shop leadtime requirements under conditions of controlled delivery performance (Q1333534) (← links)
- MRP performance effects due to forecast bias and demand uncertainty (Q1600889) (← links)
- Lot size optimisation under pooled and unpooled scenarios in batch production system (Q3163155) (← links)
- Evaluating the effects of capacity constraints and demand patterns on supply chain replenishment strategies (Q3430244) (← links)
- A dynamic forecasting model for job shop flowtime prediction and tardiness control (Q4398975) (← links)
- An integrated system for controlling shop loading and work flow (Q4399087) (← links)