Pages that link to "Item:Q1321799"
From MaRDI portal
The following pages link to Algorithms for real-time scheduling of jobs on mixed model assembly lines (Q1321799):
Displaying 11 items.
- Sequencing mixed-model assembly lines to minimize part inventory cost (Q991825) (← links)
- Sequencing mixed-model assembly lines: survey, classification and model critique (Q1011163) (← links)
- Sequencing in mixed model assembly lines: A genetic algorithm approach (Q1360125) (← links)
- A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines. (Q1406673) (← links)
- Flow-shop scheduling for three serial stations with the last two duplicate (Q1886869) (← links)
- A Lagrangean relaxation approach for the mixed-model flow line sequencing problem (Q2456653) (← links)
- Controlling mixed-model assembly lines in real-time by using distributed systems (Q2569076) (← links)
- Integrated real-time control of mixed-model assembly lines and their part feeding processes (Q2668772) (← links)
- Optimal production sequencing problem to minimise line stoppage time in a mixed-model assembly line (Q3019223) (← links)
- A mathematical model for selecting mixed models with due dates (Q4460043) (← links)
- On bills of materials structure and optimum product-level smoothing of parts usage in JIT assembly systems (Q5168734) (← links)