Pages that link to "Item:Q1357789"
From MaRDI portal
The following pages link to Shop scheduling problems under precedence constraints (Q1357789):
Displaying 8 items.
- A two-machine flowshop problem with processing time-dependent buffer constraints-an application in multimedia presentations (Q958450) (← links)
- The total completion time open shop scheduling problem with a given sequence of jobs on one machine (Q1603323) (← links)
- An effective heuristic algorithm for the partial shop scheduling problem (Q1652579) (← links)
- Two-stage hybrid flow shop with precedence constraints and parallel machines at second stage (Q1762032) (← links)
- Complexity of mixed shop scheduling problems: A survey (Q1969835) (← links)
- Complexity and approximation of open shop scheduling to minimize the makespan: a review of models and approaches (Q2147068) (← links)
- Two machine open shop scheduling problem with setup, processing and removal times separated (Q2367419) (← links)
- Vyacheslav Tanaev: contributions to scheduling and related areas (Q2434293) (← links)