Pages that link to "Item:Q1373161"
From MaRDI portal
The following pages link to A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows (Q1373161):
Displaying 11 items.
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- Maximizing the net present value of a project under uncertainty (Q1039778) (← links)
- Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap (Q1652132) (← links)
- Capital- and resource-constrained project scheduling with net present value optimization (Q1752257) (← links)
- Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure (Q1754200) (← links)
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (Q1767683) (← links)
- Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms (Q2218447) (← links)
- Metaheuristics for multi-mode capital-constrained project payment scheduling (Q2253378) (← links)
- Tabu search and simulated annealing for resource-constrained multi-project scheduling to minimize maximal cash flow gap (Q2666666) (← links)
- Optimization of a highway project planning using a modified genetic algorithm (Q4981882) (← links)
- Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty (Q6113306) (← links)