Pages that link to "Item:Q1401644"
From MaRDI portal
The following pages link to Active and stable project scheduling (Q1401644):
Displaying 10 items.
- Order-based neighborhoods for project scheduling with nonregular objective functions. (Q1399577) (← links)
- Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints (Q1590046) (← links)
- Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems (Q1754108) (← links)
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags (Q1869389) (← links)
- The construction of stable project baseline schedules (Q1877894) (← links)
- Mixed-integer linear programming for resource leveling problems (Q1926816) (← links)
- On the integration of diverging material flows into resource-constrained project scheduling (Q2160494) (← links)
- Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization (Q2356121) (← links)
- Exact methods for the resource levelling problem (Q2434257) (← links)
- A constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints (Q6102850) (← links)