Pages that link to "Item:Q1401645"
From MaRDI portal
The following pages link to PROGRESS: Optimally solving the generalized resource-constrained project scheduling problem (Q1401645):
Displayed 8 items.
- PROGRESS (Q14922) (← links)
- Finding the shortest path with honey-bee mating optimization algorithm in project management problems with constrained/unconstrained resources (Q707776) (← links)
- A random key based genetic algorithm for the resource constrained project scheduling problem (Q947946) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times (Q1014947) (← links)
- A branch and bound algorithm for project scheduling problem with spatial resource constraints (Q1666182) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- State-of-the-art exact and heuristic solution procedures for simple assembly line balancing (Q2569059) (← links)