Pages that link to "Item:Q1411630"
From MaRDI portal
The following pages link to A multi-item production planning model with setup times: algorithms, reformulations, and polyhedral characterizations for a special case (Q1411630):
Displayed 5 items.
- On a fix-and-relax framework for a class of project scheduling problems (Q817205) (← links)
- Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches (Q857326) (← links)
- Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs (Q1781573) (← links)
- An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging (Q2275834) (← links)
- Lifting, superadditivity, mixed integer rounding and single node flow sets revisited (Q5920488) (← links)