Pages that link to "Item:Q1429932"
From MaRDI portal
The following pages link to An optimal polynomial time algorithm for the common cycle economic lot and delivery scheduling problem. (Q1429932):
Displaying 5 items.
- An exact algorithm for solving the economic lot and supply scheduling problem using a power-of-two policy (Q337106) (← links)
- A hybrid algorithm for solving the economic lot and delivery scheduling problem in the common cycle case (Q2433470) (← links)
- A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains (Q2491781) (← links)
- Replenishment policy based on modified ant colony optimisation and statistical analysis under the pre-order penetration point (Q3615552) (← links)
- Economical production and transshipment policy for coordinating multiple production sites (Q5497383) (← links)