The following pages link to PROGRESS (Q14922):
Displayed 11 items.
- Finding the shortest path with honey-bee mating optimization algorithm in project management problems with constrained/unconstrained resources (Q707776) (← links)
- A random key based genetic algorithm for the resource constrained project scheduling problem (Q947946) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times (Q1014947) (← links)
- A branch and bound algorithm for project scheduling problem with spatial resource constraints (Q1666182) (← links)
- Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects (Q1841162) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- State-of-the-art exact and heuristic solution procedures for simple assembly line balancing (Q2569059) (← links)
- A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem (Q2892296) (← links)
- Network Models and Optimization (Q3499223) (← links)
- Project scheduling with time-varying resource constraints (Q4525613) (← links)