Pages that link to "Item:Q1567299"
From MaRDI portal
The following pages link to Heuristics for minimizing total weighted tardiness in flexible flow shops (Q1567299):
Displaying 7 items.
- Heuristic approaches for scheduling jobs in large-scale flexible job shops (Q342300) (← links)
- A solution approach from an analytic model to heuristic algorithm for special case of vehicle routing problem with stochastic demands (Q1023176) (← links)
- A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines (Q1743651) (← links)
- A Pareto-based adaptive variable neighborhood search for biobjective hybrid flow shop scheduling problem with sequence-dependent setup time (Q1792653) (← links)
- A new Lagrangian relaxation algorithm for hybrid flowshop scheduling to minimize total weighted completion time (Q2499163) (← links)
- Metaheuristics for the permutation flowshop problem with a weighted quadratic tardiness objective (Q2669789) (← links)
- Graphical Techniques for Detecting Lines with the Hough Transform (Q4331099) (← links)