Pages that link to "Item:Q1580980"
From MaRDI portal
The following pages link to Scheduling a flowline manufacturing cell with sequence dependent family setup times (Q1580980):
Displaying 12 items.
- New effective MILP models for PFSPs arising from real applications (Q301126) (← links)
- Effect of solution representations on tabu search in scheduling applications (Q336636) (← links)
- Flow shop batching and scheduling with sequence-dependent setup times (Q490328) (← links)
- A branch and bound enhanced genetic algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup times (Q709158) (← links)
- Total flow time minimization in a flowshop sequence-dependent group scheduling problem (Q733546) (← links)
- Process planning for circuit card assembly on a series of dual head placement machines (Q881525) (← links)
- Scheduling jobs families with learning effect on the setup (Q888283) (← links)
- Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times (Q958443) (← links)
- A hybrid heuristic approach to minimize number of tardy jobs in group technology systems (Q6066616) (← links)
- Intelligent optimization under the makespan constraint: rapid evaluation mechanisms based on the critical machine for the distributed flowshop group scheduling problem (Q6096611) (← links)
- Energy-aware production scheduling in the flow shop environment under sequence-dependent setup times, group scheduling and renewable energy constraints (Q6109801) (← links)
- An asymmetric traveling salesman problem based matheuristic algorithm for flowshop group scheduling problem (Q6113360) (← links)