Pages that link to "Item:Q1580980"
From MaRDI portal
The following pages link to Scheduling a flowline manufacturing cell with sequence dependent family setup times (Q1580980):
Displayed 14 items.
- A branch and bound enhanced genetic algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup times (Q709158) (← links)
- Total flow time minimization in a flowshop sequence-dependent group scheduling problem (Q733546) (← links)
- Process planning for circuit card assembly on a series of dual head placement machines (Q881525) (← links)
- Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times (Q958443) (← links)
- Robust scheduling on a single machine to minimize total flow time (Q1762157) (← links)
- Solving the serial batching problem in job shop manufacturing systems (Q1926815) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times (Q2572851) (← links)
- A review of TSP based approaches for flowshop scheduling (Q2572854) (← links)
- Using genetic algorithm in two-machine flexible flow-shop scheduling with setup times (Q3002327) (← links)
- Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times (Q3055422) (← links)
- Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups (Q3163328) (← links)
- Set-up games: a heuristic game-theoretic approach to set-up decisions for heterarchical manufacturing systems (Q4671316) (← links)
- Scheduling in cellular manufacturing systems: an heuristic approach (Q5444621) (← links)