Pages that link to "Item:Q1590034"
From MaRDI portal
The following pages link to The impact of resource flexibility and staffing decisions on cellular and departmental shop performance (Q1590034):
Displaying 7 items.
- Scheduling with flexible resources in parallel workcenters to minimize maximum completion time (Q850309) (← links)
- Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs (Q858442) (← links)
- Minimizing the number of late jobs for the permutation flowshop problem with secondary resources (Q941545) (← links)
- A performance comparison and evaluation of metaheuristics for a batch scheduling problem in a multi-hybrid cell manufacturing system with skilled workforce assignment (Q1717033) (← links)
- Production, maintenance and resource scheduling: a review (Q2098022) (← links)
- Lean holistic fuzzy methodology employing cross-functional worker teams for new product development projects: a real case study from high-tech industry (Q2286890) (← links)
- Impact of worker and shop flexibility on assembly cells (Q5444495) (← links)