Pages that link to "Item:Q1600885"
From MaRDI portal
The following pages link to Solving a large-scale industrial scheduling problem using MILP combined with a heuristic procedure (Q1600885):
Displayed 4 items.
- An experimental analysis of solution performance in a resource sharing and scheduling problem (Q1776960) (← links)
- Integer programming approach to reactive scheduling in make-to-order manufacturing (Q2473247) (← links)
- Scheduling of road vehicles in sugarcane transport: a case study at an Australian sugar mill (Q2575581) (← links)
- Optimal scheduling for flexible job shop operation (Q5466730) (← links)