Pages that link to "Item:Q1665710"
From MaRDI portal
The following pages link to Note on a single-machine scheduling problem with sum of processing times based learning and ready times (Q1665710):
Displayed 4 items.
- Minimizing the makespan for a two-stage three-machine assembly flow shop problem with the sum-of-processing-time based learning effect (Q1727266) (← links)
- Re-entrant flowshop scheduling with learning considerations to minimize the makespan (Q1787748) (← links)
- Single-machine scheduling with learning effects and maintenance: a methodological note on some polynomial-time solvable cases (Q1993121) (← links)
- A Branch-and-Bound Algorithm for Two-Agent Scheduling with Learning Effect and Late Work Criterion (Q4689397) (← links)