The following pages link to Xian-Yu Yu (Q1689066):
Displaying 15 items.
- (Q350482) (redirect page) (← links)
- Single machine scheduling problem with two synergetic agents and piece-rate maintenance (Q350484) (← links)
- Single-machine scheduling with periodic maintenance to minimize makespan revisited (Q398924) (← links)
- Minimizing the makespan for scheduling problems with general deterioration effects (Q460302) (← links)
- Single-machine scheduling with piece-rate maintenance and interval constrained position-dependent processing times (Q505770) (← links)
- Single machine scheduling with aging effect and upper-bounded actual processing times (Q1639804) (← links)
- The study of group scheduling problems with general dual-position-based job processing times (Q1689067) (← links)
- Multi-machine scheduling with interval constrained position-dependent processing times (Q1716992) (← links)
- Capability of artificial neural network for forward conversion of geodetic coordinates \((\phi ,\lambda ,h)\) to Cartesian coordinates \((X,Y,Z)\) (Q1798775) (← links)
- An uncertain possibility-probability information fusion method under interval type-2 fuzzy environment and its application in stock selection (Q2225175) (← links)
- Multi-machine scheduling with general position-based deterioration to minimize total load revisited (Q2448108) (← links)
- CU Partition Mode Decision for HEVC Hardwired Intra Encoder Using Convolution Neural Network (Q4616780) (← links)
- (Q4926671) (← links)
- Scheduling with day shifts and breaks (Q6070109) (← links)
- Short‐term scheduling with machine calibration (Q6082198) (← links)