Pages that link to "Item:Q1701708"
From MaRDI portal
The following pages link to A two-agent single-machine scheduling problem with late work criteria (Q1701708):
Displayed 16 items.
- Polynomial time approximation scheme for two parallel machines scheduling with a common due date to maximize early work (Q1673940) (← links)
- Two-agent-based single-machine scheduling with switchover time to minimize total weighted completion time and makespan objectives (Q1730482) (← links)
- Single-machine Pareto-scheduling with multiple weighting vectors for minimizing the total weighted late works (Q2083387) (← links)
- Pareto-scheduling of two competing agents with their own equal processing times (Q2140187) (← links)
- A survey of due-date related single-machine with two-agent scheduling problem (Q2190270) (← links)
- Single-machine scheduling with multi-agents to minimize total weighted late work (Q2197329) (← links)
- Fully polynomial time approximation scheme to maximize early work on parallel machines with common due date (Q2301935) (← links)
- A note on a two-agent scheduling problem related to the total weighted late work (Q2424661) (← links)
- Scheduling with competing agents, total late work and job rejection (Q2668778) (← links)
- A Branch-and-Bound Algorithm for Two-Agent Scheduling with Learning Effect and Late Work Criterion (Q4689397) (← links)
- Proportionate Flow Shop Scheduling with Two Competing Agents to Minimize Weighted Late Work and Weighted Number of Late Jobs (Q5012893) (← links)
- Two-machine flow-shop scheduling to minimize total late work: revisited (Q5059191) (← links)
- Bicriterion Pareto‐scheduling of equal‐length jobs on a single machine related to the total weighted late work (Q6057022) (← links)
- Pareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late work (Q6077487) (← links)
- Single-machine preemptive scheduling with release dates involving the total weighted late work criterion (Q6093999) (← links)
- A new perspective on single-machine scheduling problems with late work related criteria (Q6160955) (← links)