The following pages link to Grzegorz Pawlak (Q1707670):
Displayed 6 items.
- An integrated model for the transshipment yard scheduling problem (Q1707671) (← links)
- Complexity of scheduling problem in single-machine flexible manufacturing system with cyclic transportation and unlimited buffers (Q2412847) (← links)
- (Q2712359) (← links)
- A Parallel Branch-and-Bound Approach to the Rectangular Guillotine Strip Cutting Problem (Q2899099) (← links)
- (Q4843439) (← links)
- New algorithms for coupled tasks scheduling – a survey (Q4917224) (← links)