Pages that link to "Item:Q1738814"
From MaRDI portal
The following pages link to Robust single machine scheduling with a flexible maintenance activity (Q1738814):
Displaying 9 items.
- Optimally rescheduling jobs with a last-in-first-out buffer (Q2066687) (← links)
- Multi-machine preventive maintenance scheduling with imperfect interventions: a restless bandit approach (Q2177821) (← links)
- Minimizing maximum tardiness on a single machine with family setup times and machine disruption (Q2668648) (← links)
- Minimizing the sum of completion times on a single machine with health index and flexible maintenance operations (Q6109303) (← links)
- Minimizing tardiness scheduling measures with generalized due-dates and a maintenance activity (Q6109346) (← links)
- A state-of-the-art survey on multi-scenario scheduling (Q6113303) (← links)
- Algorithms for rescheduling jobs with a LIFO buffer to minimize the weighted number of late jobs (Q6116027) (← links)
- Simultaneous predictive maintenance and inventory policy in a continuously monitoring system using simulation optimization (Q6164358) (← links)
- A lexicographic optimization approach for a bi-objective parallel-machine scheduling problem minimizing total quality loss and total tardiness (Q6164626) (← links)