Pages that link to "Item:Q1750476"
From MaRDI portal
The following pages link to Comparing sequential and integrated approaches for the production routing problem (Q1750476):
Displaying 8 items.
- Optimisation model for multi-item multi-echelon supply chains with nested multi-level products (Q2029320) (← links)
- An infeasible space exploring matheuristic for the production routing problem (Q2076821) (← links)
- The inventory replenishment policy in an uncertain production-inventory-routing system (Q2083392) (← links)
- Solving an integrated scheduling and routing problem with inventory, routing and penalty costs (Q2239995) (← links)
- A mathematical programming-based heuristic for the production routing problem with transshipments (Q2664374) (← links)
- A hybrid collaborative framework for integrated production scheduling and vehicle routing problem with batch manufacturing and soft time windows (Q6047896) (← links)
- Split demand and deliveries in an integrated three-level lot sizing and replenishment problem (Q6065626) (← links)
- Cost minimizing planning of container inspection and repair in multiple facilities (Q6103189) (← links)