Pages that link to "Item:Q1751727"
From MaRDI portal
The following pages link to A branch and price algorithm to solve the integrated production planning and scheduling in bulk ports (Q1751727):
Displaying 9 items.
- Tug scheduling for hinterland barge transport: a branch-and-price approach (Q1681331) (← links)
- Scheduling reclaimer operations in the stockyard to minimize makespan (Q1782041) (← links)
- Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system (Q2286964) (← links)
- A flexible job shop scheduling approach with operators for coal export terminals -- a mature approach (Q2289910) (← links)
- Stockpile scheduling with geometry constraints in dry bulk terminals (Q2668656) (← links)
- Storage Yard Management: Modelling and Solving (Q5111125) (← links)
- A multi‐period integrated planning and scheduling approach for developing energy systems (Q6054526) (← links)
- Scheduling wagons to unload in bulk cargo ports with uncertain processing times (Q6068691) (← links)
- A smart energy scheduling under uncertainties of an iron ore stockyard-port system using a rolling horizon algorithm (Q6551130) (← links)