Pages that link to "Item:Q1767678"
From MaRDI portal
The following pages link to A review of exact solution methods for the non-preemptive multiprocessor flowshop problem (Q1767678):
Displayed 30 items.
- Practical solutions for a dock assignment problem with trailer transportation (Q319870) (← links)
- Control methods for dynamic time-based manufacturing under customized product lead times (Q439459) (← links)
- Bounding strategies for the hybrid flow shop scheduling problem (Q545969) (← links)
- Scheduling open shops with parallel machines to minimize total completion time (Q609214) (← links)
- Algorithms for a realistic variant of flowshop scheduling (Q732880) (← links)
- Optimal solutions for a dock assignment problem with trailer transportation (Q744629) (← links)
- Optimal scheduling of a two-stage hybrid flow shop (Q857819) (← links)
- A taxonomy of flexible flow line scheduling procedures (Q859681) (← links)
- Mixed binary integer programming formulations for the flow shop scheduling problems. A case study: ISD projects scheduling (Q870153) (← links)
- A memetic algorithm for the flexible flow line scheduling problem with processor blocking (Q954039) (← links)
- Shifting representation search for hybrid flexible flowline problems (Q992723) (← links)
- Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint (Q1009206) (← links)
- Hybrid flexible flowshop problems: models and solution methods (Q1634549) (← links)
- A discrete time exact solution approach for a complex hybrid flow-shop scheduling problem with limited-wait constraints (Q1762015) (← links)
- Two-stage hybrid flow shop scheduling with dynamic job arrivals (Q1762160) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- Metaheuristic algorithms for the hybrid flowshop scheduling problem (Q2273670) (← links)
- Machine scheduling in production: a content analysis (Q2294174) (← links)
- The evolution of schematic representations of flow shop scheduling problems (Q2304109) (← links)
- A heuristic for scheduling in a two-stage hybrid flowshop with renewable resources shared among the stages (Q2356251) (← links)
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective (Q2379653) (← links)
- Flexible job shop scheduling with blockages (Q2454071) (← links)
- Energy aware scheduling in flexible flow shops with hybrid particle swarm optimization (Q2664442) (← links)
- Capacity-filtering algorithms for finite-capacity planning of a flexible flow line (Q3055437) (← links)
- Multi-objective master production scheduling in make-to-order manufacturing (Q3605399) (← links)
- A multi‐objective customer orders assignment and resource leveling in make‐to‐order manufacturing (Q5438563) (← links)
- Conceptual framework for lot-sizing and scheduling of flexible flow lines (Q5466729) (← links)
- An efficient heuristic method for joint optimization of train scheduling and stop planning on double-track railway systems (Q5882416) (← links)
- Constraint programming for multi-line parallel partial disassembly line balancing problem with optional common stations (Q6048922) (← links)
- A systematic review of multi-objective hybrid flow shop scheduling (Q6112731) (← links)