Pages that link to "Item:Q1768595"
From MaRDI portal
The following pages link to Flow shop scheduling problems under machine-dependent precedence constraints (Q1768595):
Displaying 4 items.
- A two-machine flowshop problem with processing time-dependent buffer constraints-an application in multimedia presentations (Q958450) (← links)
- Two-stage hybrid flow shop with precedence constraints and parallel machines at second stage (Q1762032) (← links)
- Vyacheslav Tanaev: contributions to scheduling and related areas (Q2434293) (← links)
- Minimizing the makespan in a two-machine cross-docking flow shop problem (Q2519078) (← links)