Pages that link to "Item:Q1770714"
From MaRDI portal
The following pages link to On computing the latest starting times and floats of activities in a network with imprecise durations (Q1770714):
Displaying 12 items.
- Time-cost trade-off analysis of project networks in fuzzy environments (Q421542) (← links)
- Solution of interval PERT/CPM network problems by a simplified tabular method (Q505096) (← links)
- Criticality analysis of activity networks under interval uncertainty (Q633555) (← links)
- A path enumeration approach for the analysis of critical activities in fuzzy networks (Q713412) (← links)
- On the latest starting times and criticality of activities in a network with imprecise durations (Q988966) (← links)
- A simple approach to fuzzy critical path analysis in project networks (Q1031604) (← links)
- Minmax regret approach and optimality evaluation in combinatorial optimization problems with interval and fuzzy weights (Q1044085) (← links)
- Computing latest starting times of activities in interval-valued networks with minimal time lags (Q1044116) (← links)
- Intuitionistic fuzzy multi-criteria group decision making with an application to critical path selection (Q1730473) (← links)
- Analysis of critical paths in a project network with fuzzy activity times (Q2370365) (← links)
- A New Approach to Find Project Characteristics and Multiple Possible Critical Paths in a Fuzzy Project Network (Q5216837) (← links)
- Evaluation of the quantiles and superquantiles of the makespan in interval valued activity networks (Q6109311) (← links)