The following pages link to Richard Ying Kit Fung (Q186218):
Displaying 27 items.
- (Q223537) (redirect page) (← links)
- Optimal \(K\)-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times (Q282247) (← links)
- Estimating the functional relationships for quality function deployment under uncertainties (Q812604) (← links)
- Synchronization of inventory and transportation under flexible vehicle constraint: A heuristics approach using sliding windows and hierarchical tree structure (Q1011226) (← links)
- Two-phase heuristic algorithms for full truckloads multi-depot capacitated vehicle routing problem in carrier collaboration (Q1046714) (← links)
- A new approach to quality function deployment planning with financial consideration (Q1603340) (← links)
- Quality investing and pricing strategies by startups: impacts of demand uncertainties and capital constraint (Q1727275) (← links)
- (Q1806588) (redirect page) (← links)
- A hybrid genetic algorithm for a type of nonlinear programming problem (Q1806589) (← links)
- Optimal ordering and pricing policies for seasonal products: impacts of demand uncertainty and capital constraint (Q2398541) (← links)
- Rating technical attributes in fuzzy QFD by integrating fuzzy weighted average method and fuzzy expected value operator (Q2503226) (← links)
- Understanding of fuzzy optimization: theories and methods (Q2571170) (← links)
- A SCATTER SEARCH FOR MULTI-DEPOT VEHICLE ROUTING PROBLEM WITH WEIGHT-RELATED COST (Q3013562) (← links)
- A Genetic Algorithm for the Batch Scheduling with Sequence-Dependent Setup Times (Q3063268) (← links)
- Fuzzy expected value modelling approach for determining target values of engineering characteristics in QFD (Q3369510) (← links)
- Temporized coloured Petri nets with changeable structure (CPN-CS) for performance modelling of dynamic production systems (Q4497257) (← links)
- Model and method based on GA for nonlinear programming problems with fuzzy objective and resources (Q4546766) (← links)
- Adaptive production scheduling of virtual production systems using object-oriented Petri nets with changeable structure (Q4656113) (← links)
- A new method for joint replenishment problems (Q4658416) (← links)
- Fuzzy modelling and simulation for aggregate production planning (Q4668249) (← links)
- Modelling of semiconductor wafer fabrication systems by extended object-oriented Petri nets (Q4671391) (← links)
- Product design resources optimization using a non-linear fuzzy quality function deployment model (Q4674449) (← links)
- Fuzzy regression-based mathematical programming model for quality function deployment (Q4823500) (← links)
- A dynamic scheduling algorithm for singe-arm two-cluster tools with flexible processing times (Q5058723) (← links)
- The infrastructure of the timed EOPNs-based multiple-objective real-time scheduling system for 300 mm wafer fab (Q5428720) (← links)
- Stable factorized quasi-Newton methods for nonlinear least-squares problems (Q5936067) (← links)
- Extension of a hybrid genetic algorithm for nonlinear programming problems with equality and inequality constraints. (Q5952787) (← links)