Pages that link to "Item:Q1869389"
From MaRDI portal
The following pages link to A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags (Q1869389):
Displaying 22 items.
- On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations (Q280157) (← links)
- Modelling and solving generalised operational surgery scheduling problems (Q342152) (← links)
- Time and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centres (Q439612) (← links)
- A min-flow algorithm for minimal critical set detection in resource constrained project scheduling (Q456733) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- Mathematical model for cyclic scheduling with work-in-process minimization (Q656064) (← links)
- A double genetic algorithm for the MRCPSP/max (Q709102) (← links)
- Reactive scheduling in the multi-mode RCPSP (Q709110) (← links)
- A branch and bound algorithm for the one-machine scheduling problem with minimum and maximum time lags (Q872246) (← links)
- A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags (Q929315) (← links)
- Skilled workforce scheduling in service centres (Q954927) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- Scheduling under the network of temporo-spatial proximity relationships (Q1652320) (← links)
- A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags (Q1736833) (← links)
- A modified PSO algorithm for minimizing the total costs of resources in MRCPSP (Q1954712) (← links)
- A polyhedral study of event-based models for the resource-constrained project scheduling problem (Q2173056) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (Q2432851) (← links)
- Project selection, scheduling and resource allocation with time dependent returns (Q2519075) (← links)
- A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting (Q2798120) (← links)
- A PARTICLE SWARM OPTIMIZATION-BASED ALGORITHM FOR JOB-SHOP SCHEDULING PROBLEMS (Q3573666) (← links)
- A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times (Q6109310) (← links)