Pages that link to "Item:Q1885972"
From MaRDI portal
The following pages link to A branch-and-bound algorithm for the early/tardy machine scheduling problem with a common due-date and sequence-dependent setup time (Q1885972):
Displaying 12 items.
- An exact algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times (Q339586) (← links)
- A branch and bound algorithm of the single machine schedule with sequence dependent setup times for minimizing total tardiness (Q864814) (← links)
- Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times (Q941547) (← links)
- A differential evolution approach for the common due date early/tardy job scheduling problem (Q941556) (← links)
- Algorithms for job scheduling problems with distinct time windows and general earliness/tardiness penalties (Q1652242) (← links)
- Earliness-tardiness scheduling with setup considerations (Q1777159) (← links)
- Heuristic and exact algorithms for the two-machine just in time job shop scheduling problem (Q1793464) (← links)
- Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries for multiple customers in supply chains (Q2355078) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- A Meta-RaPS for the early/tardy single machine scheduling problem (Q3055652) (← links)
- Exact mathematical formulations and metaheuristic algorithms for production cost minimization: a case study of the cable industry (Q5257894) (← links)
- Some dominance properties for single-machine tardiness problems with sequence-dependent setup (Q5485050) (← links)