Pages that link to "Item:Q1890184"
From MaRDI portal
The following pages link to Project scheduling with time windows. From theory to applications. (Q1890184):
Displayed 11 items.
- An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations (Q439614) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations (Q709101) (← links)
- Minimizing the completion time of a project under resource constraints and feeding precedence relations: a Lagrangian relaxation based lower bound (Q766253) (← links)
- A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags (Q929315) (← links)
- Theoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy models (Q983626) (← links)
- Learning heuristics for basic block instruction scheduling (Q1009193) (← links)
- Flight gate scheduling with respect to a reference schedule (Q1761900) (← links)
- GRASP and path relinking for project scheduling under partially renewable resources (Q2482792) (← links)
- A new formulation of the resource-unconstrained project scheduling problem with generalized precedence relations to minimize the completion time (Q3064043) (← links)
- Disruption management in flight gate scheduling (Q5422016) (← links)