Pages that link to "Item:Q1893607"
From MaRDI portal
The following pages link to Minimizing the sum of absolute deviations about a common due date for the two-machine flow shop problem (Q1893607):
Displayed 5 items.
- Scheduling in a two-machine flowshop for the minimization of the mean absolute deviation from a common due date (Q947941) (← links)
- A survey of the state-of-the-art of common due date assignment and scheduling research (Q1600949) (← links)
- Scheduling with common due date, earliness and tardiness penalties for multimachine problems: a survey (Q1765094) (← links)
- On the complexity and some properties of multi-stage scheduling problems with earliness and tardiness penalties (Q1765543) (← links)
- Flow shop scheduling with earliness, tardiness, and intermediate inventory holding costs (Q3156731) (← links)