Pages that link to "Item:Q1926618"
From MaRDI portal
The following pages link to A note on the two-stage hybrid flow shop problem with dedicated machines (Q1926618):
Displayed 7 items.
- A note on ``A heuristic method for two-stage hybrid flow shop with dedicated machines'' (Q336500) (← links)
- A heuristic method for two-stage hybrid flow shop with dedicated machines (Q339604) (← links)
- Exact resolution of the two-stage hybrid flow shop with dedicated machines (Q479265) (← links)
- Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines (Q1651647) (← links)
- On the optimality conditions of the two-machine flow shop problem (Q1754105) (← links)
- Two-dedicated-machine scheduling problem with precedence relations to minimize makespan (Q2448211) (← links)
- On the two-stage hybrid flow shop with dedicated machines (Q3194700) (← links)