Pages that link to "Item:Q1969905"
From MaRDI portal
The following pages link to A problem reduction and decomposition approach for scheduling for a flowshop of batch processing machines (Q1969905):
Displaying 13 items.
- Minimizing makespan with multiple-orders-per-job in a two-machine flowshop (Q879285) (← links)
- The coordination of transportation and batching scheduling (Q965544) (← links)
- A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines (Q1743651) (← links)
- Family scheduling with batch availability in flow shops to minimize makespan (Q1743654) (← links)
- Two-stage hybrid flow shop scheduling with dynamic job arrivals (Q1762160) (← links)
- Integrated problem of soaking pit heating and hot rolling scheduling in steel plants (Q2003439) (← links)
- A survey of scheduling with parallel batch (p-batch) processing (Q2076906) (← links)
- Online algorithms to schedule a proportionate flexible flow shop of batching machines (Q2093188) (← links)
- MIP formulations and heuristics for solving parallel batching problems (Q2429916) (← links)
- Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company (Q2480208) (← links)
- Mixed integer formulation to minimize makespan in a flow shop with batch processing machines (Q2486757) (← links)
- TWO-STAGE FLOWSHOP SCHEDULING PROBLEMS WITH IDENTICAL AND BATCH PROCESSORS (Q3069763) (← links)
- A HYBRID TWO-STAGE FLOWSHOP SCHEDULING PROBLEM (Q3430322) (← links)