Pages that link to "Item:Q1991263"
From MaRDI portal
The following pages link to An exact solution approach for scheduling cooperative gantry cranes (Q1991263):
Displaying 10 items.
- Discrete and continuous-time formulations for dealing with break periods: preemptive and non-preemptive scheduling (Q1999390) (← links)
- Routing two stacking cranes with predetermined container sequences (Q2059087) (← links)
- Twin-crane scheduling during seaside workload peaks with a dedicated handshake area (Q2124909) (← links)
- An efficient heuristic for minimizing the number of moves for the retrieval of a single item in a puzzle-based storage system with multiple escorts (Q2140139) (← links)
- Solving a large cutting problem in the glass manufacturing industry (Q2189955) (← links)
- A decomposition-based approach to the scheduling of identical automated yard cranes at container terminals (Q2286432) (← links)
- A flexible job shop scheduling approach with operators for coal export terminals -- a mature approach (Q2289910) (← links)
- Approximation algorithms for the twin robot scheduling problem (Q2305018) (← links)
- Straddle carrier routing at seaport container terminals in the presence of short term quay crane buffer areas (Q2315629) (← links)
- Stockpile scheduling with geometry constraints in dry bulk terminals (Q2668656) (← links)