Pages that link to "Item:Q2029023"
From MaRDI portal
The following pages link to A bi-objective heuristic approach for green identical parallel machine scheduling (Q2029023):
Displayed 5 items.
- A survey of job shop scheduling problem: the types and models (Q2146994) (← links)
- Exact and heuristic solution approaches for energy-efficient identical parallel machine scheduling with time-of-use costs (Q6096614) (← links)
- Job scheduling under time-of-use energy tariffs for sustainable manufacturing: a survey (Q6112694) (← links)
- Production and energy mode control of a production-inventory system (Q6112704) (← links)
- Optimising makespan and energy consumption in task scheduling for parallel systems (Q6164588) (← links)