The following pages link to Jen-Shiang Chen (Q207228):
Displayed 14 items.
- Scheduling multiple orders per job in a single machine to minimize total completion time (Q992578) (← links)
- Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan (Q2482821) (← links)
- Mixed binary integer programming formulations for the reentrant job shop scheduling problem (Q2485171) (← links)
- An integrated inventory model with ordering cost and setup cost reductions under just-in-time purchasing (Q3008609) (← links)
- Two-Machine Flow-Shop Scheduling with Job Delivery Coordination (Q3192861) (← links)
- Model formulations for the machine scheduling problem with limited waiting time constraints (Q3429070) (← links)
- Integration of finished goods batch delivery into production scheduling via total tardiness minimization (Q3512025) (← links)
- (Q3517338) (← links)
- Minimizing makespan in re-entrant permutation flow-shops (Q4661115) (← links)
- (Q5376470) (← links)
- Using integer programming to solve the machine scheduling problem with a flexible maintenance activity (Q5480415) (← links)
- Minimising mean tardiness with alternative operations in two-machine flow-shop scheduling (Q5712093) (← links)
- A heuristic approach for single-machine scheduling with due dates and class setups. (Q5945318) (← links)
- Minimizing tardiness in a two-machine flow-shop (Q5959377) (← links)