The following pages link to Erhan Kozan (Q207264):
Displayed 36 items.
- Item:Q207264 (redirect page) (← links)
- An integrated approach for earthwork allocation, sequencing and routing (Q296873) (← links)
- A multi-criteria approach for hospital capacity analysis (Q323555) (← links)
- Dynamic resource allocation to improve emergency department efficiency in real time (Q323566) (← links)
- Determining operations affected by delay in predictive train timetables (Q336779) (← links)
- Parallel-identical-machine job-shop scheduling with different stage-dependent buffering requirements (Q342448) (← links)
- A new constraint programming approach for optimising a coal rail system (Q523170) (← links)
- Comparative analysis of three metaheuristics for short-term open pit block sequencing (Q525065) (← links)
- Optimising a coal rail network under capacity constraints (Q656055) (← links)
- A job-shop scheduling approach for optimising sugarcane rail operations (Q656056) (← links)
- Techniques for restricting multiple overtaking conflicts and performing compound moves when constructing new train schedules (Q969881) (← links)
- Optimised loading patterns for intermodal trains (Q991838) (← links)
- Scheduling trains as a blocking parallel-machine job shop scheduling problem (Q1017462) (← links)
- A hybrid metaheuristic algorithm to optimise a real-world robotic cell (Q1652331) (← links)
- An integrated approach for scheduling health care activities in a hospital (Q1681540) (← links)
- Energy efficient scheduling of open-pit coal mine trucks (Q1683111) (← links)
- Ant colony optimisation for machine layout problems (Q1888150) (← links)
- A sequencing approach for creating new train timetables (Q2267382) (← links)
- A disjunctive graph model and framework for constructing new train schedules (Q2379528) (← links)
- Mathematical modelling of container transfers and storage locations at seaport terminals (Q2432103) (← links)
- Parallel machine scheduling and common due window assignment with job independent earliness and tardiness costs (Q2510197) (← links)
- An assignment model for dynamic load planning of intermodal trains (Q2565764) (← links)
- An integrated material handling system for a truck assembly plant (Q3156530) (← links)
- Scheduling Trains on Parallel Lines with Crossover Points (Q3401662) (← links)
- (Q3598865) (← links)
- Increasing the operational efficiency of container terminals in Australia (Q4367028) (← links)
- THE ASSIGNMENT OF INDIVIDUAL RENEWABLE RESOURCES IN SCHEDULING (Q4650602) (← links)
- Sequencing and scheduling in flowshops with task redistribution (Q4658528) (← links)
- Job scheduling with technical constraints (Q4661129) (← links)
- (Q4668752) (← links)
- (Q4668757) (← links)
- (Q4668766) (← links)
- (Q4668772) (← links)
- Alternative algorithms for the optimization of a simulation model of a multimodal container terminal (Q5429835) (← links)
- An approach to determine storage locations of containers at seaport terminals (Q5945331) (← links)
- A real-world mine excavators timetabling methodology in open-pit mining (Q6050355) (← links)