The following pages link to Vicente Valls (Q213349):
Displaying 21 items.
- Time and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centres (Q439612) (← links)
- An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags (Q657259) (← links)
- A population-based approach to the resource-constrained project scheduling problem (Q702733) (← links)
- A double genetic algorithm for the MRCPSP/max (Q709102) (← links)
- Skilled workforce scheduling in service centres (Q954927) (← links)
- Scheduling projects with limited number of preemptions (Q1025235) (← links)
- A graph colouring model for assigning a heterogeneous workforce to a given schedule (Q1266545) (← links)
- A branch and bound algorithm for minimizing the number of crossing arcs in bipartite graphs (Q1266546) (← links)
- Pre-processing techniques for resource allocation in the heterogeneous case (Q1296109) (← links)
- ARC crossing minimization in hierarchical digraphs with tabu search (Q1373159) (← links)
- Resource-constrained project scheduling: A critical activity reordering heuristic (Q1399574) (← links)
- Minimizing weighted tardiness of jobs with stochastic interruptions in parallel machines (Q1590047) (← links)
- A tabu search approach to machine scheduling (Q1609892) (← links)
- Justification and RCPSP: a technique that pays (Q1772841) (← links)
- A tabu thresholding algorithm for arc crossing minimization in bipartite graphs (Q1919842) (← links)
- A hybrid genetic algorithm for the resource-constrained project scheduling problem (Q2455614) (← links)
- Pre-emption in resource-constrained project scheduling (Q2482791) (← links)
- (Q3426430) (← links)
- (Q3426434) (← links)
- (Q4350073) (← links)
- Criticality analysis in activity-on-node networks with minimal time lags (Q5948192) (← links)