The following pages link to Sönke Hartmann (Q213362):
Displaying 14 items.
- Experimental investigation of heuristics for resource-constrained project scheduling: an update (Q858327) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- A note on ``Hierarchical models for multi-project planning and scheduling'' (Q1278323) (← links)
- An exact algorithm for project scheduling with multiple modes (Q1372766) (← links)
- A general framework for scheduling equipment and manpower at container terminals (Q1424375) (← links)
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem (Q1590044) (← links)
- Generating scenarios for simulation and optimization of container terminal logistics (Q1880312) (← links)
- Project scheduling under limited resources. Models, methods, and applications (Q1962879) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- Inventory-based dispatching of automated guided vehicles on container terminals (Q2432092) (← links)
- (Q4248938) (← links)
- Project scheduling with multiple modes: A comparison of exact algorithms (Q4540083) (← links)
- A self-adapting genetic algorithm for project scheduling under resource constraints (Q4803318) (← links)
- Project scheduling with multiple modes: A genetic algorithm (Q5948197) (← links)