Pages that link to "Item:Q2275802"
From MaRDI portal
The following pages link to Two-stage production scheduling with an outsourcing option (Q2275802):
Displayed 8 items.
- The design of simple subcontracting rules for make-to-order shops: an assessment by simulation (Q297422) (← links)
- A constraint generation approach for two-machine shop problems with jobs selection (Q1751902) (← links)
- An improved algorithm for a two-stage production scheduling problem with an outsourcing option (Q2034787) (← links)
- Scheduling with divisible jobs and subcontracting option (Q2147141) (← links)
- Scheduling of two-machine flowshop with outsourcing lead-time (Q2147158) (← links)
- OUTSOURCING DECISIONS IN m-MACHINE PERMUTATION FLOW SHOP SCHEDULING PROBLEMS WITH MACHINE-DEPENDENT PROCESSING TIMES (Q2931728) (← links)
- Outsourcing and scheduling for a two-machine flow shop with release times (Q5058745) (← links)
- TWO-MACHINE FLOW SHOP SCHEDULING WITH INDIVIDUAL OPERATION'S REJECTION (Q5411726) (← links)