The following pages link to Zu-Hua Jiang (Q2296471):
Displaying 12 items.
- (Q782260) (redirect page) (← links)
- Tristage bargaining dynamic game-based preventive maintenance for electric multiple unit (Q782261) (← links)
- A metaheuristic algorithm to transporter scheduling for assembly blocks in a shipyard considering precedence and cooperating constraints (Q2296473) (← links)
- (Q3411715) (← links)
- (Q3419443) (← links)
- (Q3461443) (← links)
- (Q4688266) (← links)
- (Q5194182) (← links)
- (Q5310724) (← links)
- Joint Optimization of Production Plan and Preventive Maintenance Schedule by Stackelberg Game (Q5359052) (← links)
- SPATIAL SCHEDULING AND WORKFORCE ASSIGNMENT PROBLEM IN BLOCK ASSEMBLY SHOP OF SHIPBUILDING (Q5411733) (← links)
- Integer programming model and branch-and-cut algorithm for the stack inbound and pre-marshalling problem (Q6164614) (← links)