Pages that link to "Item:Q2329473"
From MaRDI portal
The following pages link to A polynomial-time approximation scheme for an arbitrary number of parallel two-stage flow-shops (Q2329473):
Displaying 6 items.
- Scheduling multiple two-stage flowshops with a deadline (Q2140576) (← links)
- Scheduling on multiple two-stage flowshops with a deadline (Q2151364) (← links)
- A polynomial-time approximation scheme for parallel two-stage flowshops under makespan constraint (Q2672605) (← links)
- On scheduling multiple parallel two-stage flowshops with Johnson's rule (Q6197646) (← links)
- Applying Johnson's rule in scheduling multiple parallel two-stage flowshops (Q6535816) (← links)
- A polynomial-time approximation scheme for an arbitrary number of parallel identical multi-stage flow-shops (Q6546990) (← links)